Welcome to visit the official website of Shenzhen Jiyou CNC Equipment Co., LTD!
13322996946
深圳市机友数控设备有限公司
Integrity Service year 11
Shenzhen jiyou CNC equipment Co., Ltd
Whole station search:
……
Your location:
文章详细内容
NEWS
NEWS CENTER
Integrity management of the consistent purpose! Know the customer's needs, for the customer's request, urgent customer's thought! For the same product, our quality is better. For the same quality, our price is lower. For the same price, our service is better.
Sheet metal slotting machine Slotting machine operation sequence
Source:www.jiyoushukong.cn | Author:pmocf50f0 | Published time: 2017-03-25 | 3829 Views | Share:

1. Blow the platform clean with air pipe first, no iron filings and other sundries are allowed;
2. Place the metal sheet on the platform. The beginning end of the plate should be aligned with the first pressure foot.
3. Determine the position of the tool head. If it is not in the correct position, it can be corrected according to "origin alignment".
4. Check whether the blade is in good condition and whether it is necessary to change the knife (white steel is needed for the planing iron plate, and alloy knife is needed for the planing stainless steel plate);
5. The tool changing shall be operated by a special person. The alloy tool changing shall be padded with 35mm high tool block;
6. After the preparation work, input the calculated bending size into the machine, and pay attention to the error of the first knife (the error is obtained from the actual measurement), and leave the pressing plate margin for the last knife;
7. After the input work is completed, press the "groove preparation" button after ensuring that the first knife is no less than 8mm, and the first knife is planed. After the body is withdrawn and the position "OK" flashes, press "beam backward" to move the beam to the next knife position, and press "Knife rest forward" to execute the next knife, and so on and so on until all the sizes are finished;
8. After the last cutting, manually shift the beam back, and push the release button of the press switch to take out the plate;
9. Clean the table.
10. Attention:
A. Lubricating oil should be filled before starting the machine every day;
B. The depth of the single cutter groove is 0.33, 0.22, 0.15, 0.15, 0.15, 0.15, 0.15, 0.15, 0.15, 0.10 and 0.10 respectively;
C. the "groove preparation" button is the button to prepare the groove before the fully automatic groove planing machine. Do not press this button during the grooving process.
D. After entering the new program, press the "emergency stop switch" to open it, and then press the "Forward tool holder" button to gouge;
E. When the bending Angle is less than 90 degrees, the slotted groove should be expanded with an obtuse knife;
F. The switch in the electric cabinet should not be switched on and off frequently. Each time the machine is shut down, just dial out the key.
G. Air duct shall be used to clean the iron filings at any time during the grooving process, and there shall be no sundries under the fixed frame of the platform;
H. When the plate fixing frame (presser foot) is not tight, the screws can be tightened with an inner hexagon spanner;
I. Pay attention to the coolant allowance and the coolant injection Angle at any time;
J. Once the machine breaks down, it should be shut down immediately for maintenance. Do not work with disease.

Your name
Tel
Content
Submit